Site Plan

BUILDING A | Under Construction - Delivering Q4 2024

SITE AREA - A

In S.F.

±1,389,832 sq. ft.

In Acres

±31.91 AC

BUILDING AREA - BLDG A

TOTAL

±303,500 sq. ft.

CLEAR HEIGHT

±36'

LOADING DOORS

Dock

74 (±9' x ±10')

Grade

4 (±14' x ±16')

PARKING (EXPANDABLE)

Auto

309 stalls

Trailer

212 stalls

BUILDING SPECS - BLDG A

Building Dimensions

±360’ x ±848’

Column Spacing

±60’ x ±56’

Spec Office

±5,560 SF

Remote Restrooms

±222 SF

HVAC

To Maintain 85 Degrees

Dock Equipment

(37) 40k LB 7’ x 8’ Mechanical Dock Levelers

Lighting

LED with 30 Foot Candles

Roofing

60 Mil TPO Membrane Roof

Power

3,000 Amps 480/277 V 3 Phase (Expandable)

ESFR

Fire Sprinkler System w/K-25 Heads

Slab

8” Concrete Over 4” ABC

Truck Court Depth

±370’ Northern Truck Courts
±190’ Southern Truck Courts

BUILDING B | Under Construction - Delivering Q4 2024

SITE AREA - B

In S.F.

±1,545,698 sq. ft.

In Acres

±35.48 AC

BUILDING AREA - BLDG B

TOTAL

±312,600 sq. ft.

CLEAR HEIGHT

±36'

LOADING DOORS

Dock

76 (±9' x ±10')

Grade

4 (±14' x ±16')

PARKING (EXPANDABLE)

Auto

329 stalls

Trailer

214 stalls

BUILDING SPECS - BLDG B

Building Dimensions

±370’ x ±840’

Column Spacing

±60’ x ±56’

Spec Office

±5,400 SF

Remote Restrooms

±222 SF

HVAC

To Maintain 85 Degrees

Dock Equipment

(38) 40k LB 7’ x 8’ Mechanical Dock Levelers

Lighting

LED with 30 Foot Candles

Roofing

60 Mil TPO Membrane Roof

Power

3,000 Amps 480/277 V 3 Phase (Expandable)

ESFR

Fire Sprinkler System w/K-25 Heads

Slab

8” Concrete Over 4” ABC

Truck Court Depth

±370’ Northern Truck Courts
±190’ Southern Truck Courts